Liberec, 24 May 2016 – Správa železniční dopravní cesty (the Railway Infrastructure Administration) improved parameters on three railway lines in the Liberec Region. The main objective of these projects was achieving a technical state corresponding to EU parameters and standards.


The following projects were implemented:

Line 030 Jaroměř – Liberec in the section Stará Paka – Malá Skála
Line 030 Jaroměř – Liberec in the section Turnov – Liberec
Line 036 Liberec – Tanvald

Projects on lines mentioned above included adaptations of the railway superstructure and substructure, platforms, bridges, culverts, railway crossings and walls. Electrical heating of switches was adapted as well in order to assure higher operation safety and functionality especially during winter. Renewal of selected distribution systems and elements of safety and signalling installations was also part of the construction.

”One of the most important assets of all construction works carried out is especially higher travelling comfort and safety on these railway lines. The projects’ implementation allowed full usage of possibilities offered by the current infrastructure in the line sections concerned which will bring shorter journey times, better turnovers of the train-sets and improved train connections. Railway transport will thus become more attractive for the travelling public“, said Mr. Pavel Surý, Director General of SŽDC.

All projects mentioned above will contribute considerably to better transport availability, decreasing operation costs and ensuring infrastructure capacity as well as railway transport quality for a prospective transport extent. Another positive impact will be an increase of railway operation smoothness and safety.

Total estimated costs of the construction designated as Line 030 Jaroměř – Liberec in the section Stará Paka – Malá Skála amounted up to 560,440,328 CZK (VAT excluded). The project was co-financed by the European Union from its Cohesion Fund under the Operational Programme Transport up to a maximum amount of 436,341,997 CZK. The construction’s suppliers were the companies EUROVIA CS, a.s. and GJW Praha spol. s r.o.

Total estimated costs of the construction designated as Line 030 Jaroměř – Liberec in the section Turnov – Liberec amounted up to 570,691,870 CZK (VAT excluded). The project was co-financed by the European Union from its Cohesion Fund under the Operational Programme Transport up to a maximum amount of 437,599,900 CZK. The construction’s suppliers were the companies EUROVIA CS, a.s. and Chládek a Tintěra, Pardubice a.s.

Total estimated costs of the construction designated as Line 036 Liberec – Tanvald amounted up to 363,938,874 CZK (VAT excluded). The project was co-financed by the European Union from its Cohesion Fund under the Operational Programme Transport up to a maximum amount of 276,226,649 CZK. The construction’s supplier was the company Chládek a Tintěra, a.s.

National financing of all above-mentioned projects was provided by the State Fund for Transport Infrastructure.

Construction Designation Line 030 Jaroměř – Liberec in the section Stará Paka – Malá Skála
Construction Investor Railway Infrastructure Administration, state organisation
Suppliers EUROVIA CS, a.s.
GJW Praha spol. s r.o.
Term of launch 7/2015
Term of completion 12/2015
Total construction costs 560,440,328 CZK (VAT excluded)
Approved EU contribution 436,341,997 CZK
Construction Designation Line 030 Jaroměř – Liberec in the section Turnov – Liberec
Construction Investor Railway Infrastructure Administration, state organisation
Suppliers EUROVIA CS, a.s.
Chládek a Tintěra, Pardubice a.s.
Term of launch 7/2015
Term of completion 2/2016
Total construction costs 570,691,870 CZK (VAT excluded)
Approved EU contribution 437,599,900 CZK
Construction Designation Line 036 Liberec – Tanvald
Construction Investor Railway Infrastructure Administration, state organisation
Supplier Chládek a Tintěra, a.s.
Term of launch 4/2015
Term of completion 1/2016
Total construction costs 363,938,874 CZK (VAT excluded)
Approved EU contribution 276,226,649 CZK