Repairs of Passenger Building At the City Railway Station in Kutná Hora

22.05.2018

Správa železniční dopravní cesty (SŽDC) completed the reconstruction of the passenger building at the railway station Kutná Hora město (City Kutná Hora). Construction works lasted from last August till this spring; the costs reached almost to CZK 8.8 million. The construction’s general designer was the company Rekomont.


During reconstruction, the external coating was completely repaired including an exchange of holes’ fillings, plumbing structures, safety and signalling components, the wiring and information system. The roof has been completely repaired as well as the waiting room and roofing, new external and internal furniture serves to all passengers. Public lavatories were also completely renovated as well as the external strengthened surface and the forecourt premises.

This year, SŽDC plans to spend almost CZK 118 million for the preparation and implementation of repairs or reconstruction of railway station buildings in Central Bohemia Region. ”At the beginning of this year, we finished repairs of the railway station building at Zdice; besides Kutná Hora, works are also near completion in Příbram,“ says Mr. Tomáš Drmola, SŽDC Deputy Director for Asset Management.

Files

Press release to download pdf